PHASE 3 WINDOW WASHING

Phase 3 window washing will take place March 3 to March 7, weather permitting.

Please be reminded that, as usual, only the outside surfaces of inaccessible windows will be washed, together with the outside surfaces of the balcony panels. Accessible windows (within the balcony enclosure) will not be washed.