As you may be aware, the phase 1 and 2 gym facility is temporarily closed.
The reason for this closure is to deal with water damage that has resulted in mould growth at the base of the walls. This damage was discovered when the baseboards in the free weight area were removed in order to install sound dampening material. The corporation immediately retained consultants who specialize in the testing and remediation of mould growth. For liability, health and safety reasons, the affected area has been closed while work is being carried out to correct the problem.
Assuming no other problems are discovered, we expect that the gym can be re-opened on Saturday, January 30.
Please be assured that everyone involved is working hard to get the gym re-opened as soon as possible, but we must obviously be concerned about the health and safety of residents and the gym cannot be re-opened until this work is complete.