Access to your unit is required on the following dates for the inspections of the in-suite common elements, including fire systems, plumbing, and a structural survey of the balcony railings.
JUNE 24th, 25th, and 26th from 8:00am to 4:00pm
If you are not present at the time of inspections, a Management representative will accompany the contractor into your unit. Note that the Corporation and its contractors are not liable for any damages while conducting these inspections.
If your unit is not accessible (e.g. lock change, alarm system, pets, etc), please notify Val Roca by MONDAY, JUNE 23rd, 2014.
Please note that any water leaks or other issues will be repaired during the inspections. For this reason, access to your unit may be required throughout the 3 day period.
Thank you in advance for your co-operation.