Bulletins

EM3 Summer Party

Phase 3

Thursday, June 19, 2014

em3-party-2013

   

In-suite Common Elements Inspection

Phase 3

Saturday, June 14, 2014

 

Access to your unit is required on the following dates for the inspections of the in-suite common elements, including fire systems, plumbing, and a structural survey of the balcony railings.

JUNE 24th, 25th, and 26th from 8:00am to 4:00pm

If you are not present at the time of inspections, a Management representative will accompany the contractor into your unit. Note that the Corporation and its contractors are not liable for any damages while conducting these inspections.

If your unit is not accessible (e.g. lock change, alarm system, pets, etc), please notify Val Roca by MONDAY, JUNE 23rd, 2014.

Please note that any water leaks or other issues will be repaired during the inspections. For this reason, access to your unit may be required throughout the 3 day period.

Thank you in advance for your co-operation.

   

Scheduled power outage Wednesday

Phase 1 | Phase 2 | Phase 3

Tuesday, June 10, 2014

Please be advised there is a Power Outage scheduled for tomorrow:

Wednesday June 11th, 2014

Between the hours of:

8:00am – 5:00pm

The Power Outage will affect the following:

 

  • Garage Doors (Shared Facilities)
  • Front Door Intercom System (Phase 1)
  • P1 FOB Entry System (Phase 1)
  • Fire Panel (Phase 1)
  • Lights (Phase 1 Stairwells & Some in the garage)
  • Elevators  (Phase 1)

 

OCSCC 668/676/ Shared Facilities’ Management Team would like to thank everyone for their patience and cooperation in advance during this mandatory repair. The repair is as a result of the generator malfunction.

   

Generator Malfunction

Phase 1 | Phase 2 | Phase 3

Monday, June 02, 2014

Please be advised the generator is currently malfunctioning. This issue affects the:

 

  • Garage Doors (Shared Facilities)
  • Intercom System (Phase 1)
  • Lights (Phase 1 & Some in the garage)
  • Elevators  (Phase 1)

 

OCSCC 668/676/ Shared Facilities’ Management Team is working hard on the issue and the contractor is onsite to repair the issue. 

 

Thank you for your patience and understanding during this repair.

   

Important Lowertown Safety Survey

Phase 1 | Phase 2 | Phase 3

Monday, May 26, 2014

This important survey concerns safety in Lower Town and is gathering opinion on the proposed safe injection site as well as general safety info. 

English survey: surveymonkey.com/s/PCJXNYB 

French survey: surveymonkey.com/s/H68X9VD

   

AC and in-unit maintenance

Phase 3

Thursday, May 22, 2014

Conversion from Heat to AC

Please note that the conversion from Heat to AC has been completed, providing AC to common areas and units.

In-Suite AC/Heating Maintenance

Unit owners are responsible to repair and maintain the heating and cooling apparatus inside their unit.

In addition to changing of filters, an annual cleaning of the condensate pan and flushing of the condensate drain is highly recommended. Failure for the unit owner to perform this maintenance could result in blockage and water damage to yours and other units.

The Corporation urges you to contact a mechanical/plumbing contractor of your choice to perform this maintenance.

   

The AC is Now On

Phase 1 | Phase 2

Tuesday, May 13, 2014

Dear Owners and Residents of East Market Phase 1 & Phase 2,

 

 

Spring is finally here!

 

The AC is now on!

 

Please be advised the heating has been switched over to cooling. We apologize for those who may have felt the heat over the weekend.

 

Thank you for your patience, cooperation, and understanding. Should you have any questions please do not hesitate to contact Management. 

   

Fire alarm and intercom testing

Phase 1 | Phase 2

Monday, May 12, 2014

FIRE ALARM/SMOKE DETECTOR/INTERCOM TESTING IN ALL UNITS

Please be advised that FPS Fire Protection Services will be testing the entire fire alarm system at 180 York St. and 383 Cumberland on:

Wednesday May 14th 2014 to Friday May 16th 2014

Between the hours of:

9:00 a.m. and 5:00 p.m.

IT IS IMPERATIVE THAT ALL UNITS BE ACCESSIBLE AT THIS TIME. FPS shall require entrance into your unit to determine that the heat detector and smoke detector in each unit is working. The Corporation is required by the Ontario Fire Marshall's office to complete this inspection in all units at this time and notify the corporation’s insurance holder of the same.

We will be using the building master key to gain access to your unit if you are not home. Some units are not on the master key system, so we ask that you ensure that you leave a key with the superintendent via the site office in order that John can gain access to your unit with the FPS Technician. Another option would be to leave a note on your door designating a neighbour who is available with your key. Please be advised that we cannot allow appointments or guarantee the time which the inspection in a specific unit will occur. Unfortunately if access is denied any charges which are incurred by the corporation will be passed on to the owner.

During testing, the fire bells will be heard ringing in the building. Please disregard them during the time period stated above. Should the alarm sound during hours other than those specified above, we would ask that you treat the alarm as an actual fire.

The safety of every resident as well as securing the financial investment of each owner is the basis on which this testing will be carried without exceptions. With everyone’s cooperation The East Market Phase I & Phase II will be a safe place to call home. We thank you for your co-operation in this matter 

   

Exterior Window Washing

Phase 3

Wednesday, May 07, 2014

EXTERIOR WINDOW WASHING

Exterior Window Washing is scheduled to start on Monday, May 19, 2014 (weather permitting).

For the washing to occur, please ensure that all items are cleared away from the exterior of your unit.

Thank you for your cooperation

 

LAVAGE DES FENÊTRES EXTÉRIEURES

Le lavage des fenêtres extérieures débutera le lundi 19 mai 2014 (si la température le permet)

Afin de faciliter cette opération, veuillez vous assurer que tous vos articles sont enlevés à l’extérieur de votre logement.

Merci de votre collaboration.

   

Garage cleaning

Phase 3

Wednesday, April 16, 2014

Garage Cleaning & Membrane Inspection

The power washing of the G/P1/P2/P3 garage floors and overhead pipes will commence on Monday, May 5th, from 8am to 6pm.

All vehicles must be removed from the garage during these times to allow for proper maintenance and membrane inspection.

Thank you for your co-operation

 

Nettoyage du garage & inspection à la membrane

Veuillez noter que le lavage sous pression des niveaux du garage G, P1, P2 et P3 débutera le 5 may 2014, de 8h00 à 18h00.

Tous les véhicules devront être enlevés du garage durant ces travaux afin de permettre un bon nettoyage et l’inspection de la membrane.

Merci de votre collaboration.

   

Page 4 of 35